Claim governance / public register
Every public claim, with its evidence state.
A single register of the statements made across this site, each labelled by evidence state and boundary. It is compiled from the public pages; the controlled claim register remains authoritative.
C001 · Overview
Documented / controlledEvidence state · Documented / controlledA defined architecture, structure or control documented under configuration control. It is not a measured test result.SourceProgramme architecture registerBoundaryConfiguration review and partner ownership.Content reviewed 19 July 2026
26-layer programme and work-package structure defined.
Basis: Programme architecture registerBoundary: Configuration review and partner ownership.
C002 · Overview
Validation targetEvidence state · Validation targetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceProgramme specificationBoundaryCOA/SDS, characterisation and frozen batch record.Content reviewed 19 July 2026
Turbostratic graphene pathway and control arms specified at programme level.
Basis: Programme specificationBoundary: COA/SDS, characterisation and frozen batch record.
C003 · Overview
Not INFORM-validatedEvidence state · Not INFORM-validatedInsufficient, inconsistent or non-independent evidence. Carried as an explicit programme risk.SourceExternal literatureBoundaryReplicated four-electrode load-response data.Content reviewed 19 July 2026
Self-sensing mechanism and external benchmarks are literature-supported.
Basis: External literatureBoundary: Replicated four-electrode load-response data.
C004 · Overview
Concept / targetEvidence state · Concept / targetIllustrative or reference material. It is not evidence of INFORM performance.SourceConcept interfaceBoundaryEnd-to-end DAQ dry run and controlled loading.Content reviewed 19 July 2026
PULSE concept interface and intended data chain defined.
Basis: Concept interfaceBoundary: End-to-end DAQ dry run and controlled loading.
C005 · Overview
Explicit boundaryEvidence state · Explicit boundaryAn explicit limit on what the programme offers or claims at the current stage.SourceProgramme boundary statementBoundaryStage 3–5 evidence and adoption approvals.Content reviewed 19 July 2026
No product is currently offered for structural reliance.
Basis: Programme boundary statementBoundary: Stage 3–5 evidence and adoption approvals.
C006 · Technology
Literature-supportedEvidence state · Literature-supportedReported by a cited external study; not assumed to reproduce under INFORM conditions.SourceGuo et al., Nanomaterials 11 (2021)BoundaryGO is chemically and structurally different from INFORM’s target TG.Content reviewed 19 July 2026
GF 35 reported at 0.05% GO and w/c 0.35 under the cited study conditions.
Basis: Guo et al., Nanomaterials 11 (2021)Boundary: GO is chemically and structurally different from INFORM’s target TG.
C007 · Technology
Literature-supportedEvidence state · Literature-supportedReported by a cited external study; not assumed to reproduce under INFORM conditions.SourceLuong et al., Nature 577 (2020)BoundaryDoes not validate INFORM scale-up economics or TG sensing performance.Content reviewed 19 July 2026
Gram-scale flash Joule heating produces a turbostratic product; reported 7.2 kJ/g electrical energy.
Basis: Luong et al., Nature 577 (2020)Boundary: Does not validate INFORM scale-up economics or TG sensing performance.
C008 · Technology
Literature-supportedEvidence state · Literature-supportedReported by a cited external study; not assumed to reproduce under INFORM conditions.SourcePublished studies (approx. 0.05–0.5%)BoundaryClosest broad comparator for low-oxygen platelet behaviour.Content reviewed 19 July 2026
GNP conductivity and piezoresistivity depend strongly on dispersion and percolation.
Basis: Published studies (approx. 0.05–0.5%)Boundary: Closest broad comparator for low-oxygen platelet behaviour.
C009 · Technology
Validation targetEvidence state · Validation targetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceINFORM programme targetBoundaryNot an established optimum; requires batch identity, dispersion and percolation validation.Content reviewed 19 July 2026
INFORM target TG dosage: 0.03–0.06% by cement mass.
Basis: INFORM programme targetBoundary: Not an established optimum; requires batch identity, dispersion and percolation validation.
C010 · Technology
External / variableEvidence state · External / variableReported by a cited external study; not assumed to reproduce under INFORM conditions.SourceStudy-specific literatureBoundaryComparability and replication vary; reference class only.Content reviewed 19 July 2026
Some high-sensitivity rGO reports exist.
Basis: Study-specific literatureBoundary: Comparability and replication vary; reference class only.
C011 · Technology
BenchmarkEvidence state · BenchmarkReported by a cited external study; not assumed to reproduce under INFORM conditions.SourcePublished studies (approx. 0.1–1.0%)BoundaryComparator technology, not a graphene class.Content reviewed 19 July 2026
MWCNT is a mature research benchmark for self-sensing cementitious composites.
Basis: Published studies (approx. 0.1–1.0%)Boundary: Comparator technology, not a graphene class.
C012 · Validation
Documented / completeEvidence state · Documented / completeA defined architecture, structure or control documented under configuration control. It is not a measured test result.SourceValidation roadmapBoundaryArchitecture and evidence model only; no laboratory result implied.Content reviewed 19 July 2026
Stage 0 research and architecture definition is complete.
Basis: Validation roadmapBoundary: Architecture and evidence model only; no laboratory result implied.
C013 · Validation
Documented / currentEvidence state · Documented / currentA defined architecture, structure or control documented under configuration control. It is not a measured test result.SourceControlled evidence registerBoundaryNot to be represented as released until protocol, traceability, WHS and measurement readiness are verified.Content reviewed 19 July 2026
Stage 1 laboratory execution is on NO-GO / HOLD.
Basis: Controlled evidence registerBoundary: Not to be represented as released until protocol, traceability, WHS and measurement readiness are verified.
C014 · Investors
TargetEvidence state · TargetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceValue hypothesisBoundaryVariability or purification eliminates performance or cost advantage.Content reviewed 19 July 2026
Low-dose conductive carbon can be produced and specified consistently.
Basis: Value hypothesisBoundary: Variability or purification eliminates performance or cost advantage.
C015 · Investors
TargetEvidence state · TargetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceValue hypothesisBoundarySignal is dominated by moisture, contact, ageing or noise.Content reviewed 19 July 2026
A stable conductive network produces a load-linked response.
Basis: Value hypothesisBoundary: Signal is dominated by moisture, contact, ageing or noise.
C016 · Investors
UnknownEvidence state · UnknownInsufficient, inconsistent or non-independent evidence. Carried as an explicit programme risk.SourceValue hypothesisBoundaryNo incremental decision value over incumbent sensing or inspection.Content reviewed 19 July 2026
The system detects a defined event with decision-grade reliability.
Basis: Value hypothesisBoundary: No incremental decision value over incumbent sensing or inspection.
C017 · Investors
UnknownEvidence state · UnknownInsufficient, inconsistent or non-independent evidence. Carried as an explicit programme risk.SourceValue hypothesisBoundaryIntegration and assurance costs overwhelm material savings.Content reviewed 19 July 2026
Total delivered monitoring cost competes over the asset lifecycle.
Basis: Value hypothesisBoundary: Integration and assurance costs overwhelm material savings.
C018 · Investors
Future targetEvidence state · Future targetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceValue hypothesisBoundaryLiability, specification or procurement pathway remains unresolved.Content reviewed 19 July 2026
Asset owners and suppliers can procure within existing assurance pathways.
Basis: Value hypothesisBoundary: Liability, specification or procurement pathway remains unresolved.
C019 · Investors
UnknownEvidence state · UnknownInsufficient, inconsistent or non-independent evidence. Carried as an explicit programme risk.SourceResidual risk ABoundaryCarried openly into diligence.Content reviewed 19 July 2026
Delivered economics for tyre-derived turbostratic graphene at industrial volume are not established for INFORM.
Basis: Residual risk ABoundary: Carried openly into diligence.
C020 · Investors
UnknownEvidence state · UnknownInsufficient, inconsistent or non-independent evidence. Carried as an explicit programme risk.SourceResidual risk BBoundaryCarried openly into diligence.Content reviewed 19 July 2026
Gauge-factor and calibration stability under Australian service conditions remain unverified.
Basis: Residual risk BBoundary: Carried openly into diligence.
C021 · Investors
Observed gapEvidence state · Observed gapA defined architecture, structure or control documented under configuration control. It is not a measured test result.SourceStandards reviewBoundaryResidual risk C.Content reviewed 19 July 2026
No Australian design standard provides a complete acceptance route for graphene-based self-sensing structural concrete.
Basis: Standards reviewBoundary: Residual risk C.
C022 · Investors
Validation targetEvidence state · Validation targetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceResidual risk DBoundaryNot market-size forecasts alone.Content reviewed 19 July 2026
Avoided-cost logic must be confirmed through asset-owner pilots and procurement evidence.
Basis: Residual risk DBoundary: Not market-size forecasts alone.
C023 · Governance
Implemented controlEvidence state · Implemented controlA defined architecture, structure or control documented under configuration control. It is not a measured test result.SourceRisk registerBoundaryAlignment, not certification.Content reviewed 19 July 2026
Risk principles and assessment techniques (ISO 31000 / 31010) are applied as a control.
Basis: Risk registerBoundary: Alignment, not certification.
C024 · Governance
Partial alignmentEvidence state · Partial alignmentA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceISO 9001 family, ISO 45001, ISO/IEC 27001 familyBoundaryAlignment does not imply certification or accredited scope.Content reviewed 19 July 2026
Quality, configuration, OHS and information-security frameworks are partially aligned.
Basis: ISO 9001 family, ISO 45001, ISO/IEC 27001 familyBoundary: Alignment does not imply certification or accredited scope.
C025 · Governance
Validation targetEvidence state · Validation targetA hypothesis or engineering objective requiring measurement against pre-registered criteria.SourceEvidence gatesBoundaryCalibration, uncertainty and repeatability still to be demonstrated.Content reviewed 19 July 2026
Laboratory competence and measurement precision (ISO/IEC 17025 / ISO 5725).
Basis: Evidence gatesBoundary: Calibration, uncertainty and repeatability still to be demonstrated.
C026 · Governance
Reference onlyEvidence state · Reference onlyIllustrative or reference material. It is not evidence of INFORM performance.SourceISO 23247 seriesBoundaryNot evidence of civil-infrastructure compliance.Content reviewed 19 July 2026
ISO 23247 is used directionally for PULSE digital-thread architecture.
Basis: ISO 23247 seriesBoundary: Not evidence of civil-infrastructure compliance.
C027 · Pilot
Explicit boundaryEvidence state · Explicit boundaryAn explicit limit on what the programme offers or claims at the current stage.SourcePilot boundary statementBoundaryConventional design, inspection and instrumentation remain authoritative.Content reviewed 19 July 2026
No structural element should rely on INFORM sensing for safety-critical decisions during a pilot.
Basis: Pilot boundary statementBoundary: Conventional design, inspection and instrumentation remain authoritative.
C028 · PULSE interface
ConceptEvidence state · ConceptIllustrative or reference material. It is not evidence of INFORM performance.SourceConcept interfaceBoundaryIt is not live infrastructure telemetry.Content reviewed 19 July 2026
The PULSE interface is an illustrative concept.
Basis: Concept interfaceBoundary: It is not live infrastructure telemetry.
No claims match these filters.
Compiled from public pages · content reviewed 19 July 2026 · the controlled claim register is authoritative.